SOME OF OUR PROJECTS

SOME OF OUR PROJECTS BUT NOT ALL ARE LISTED BELOW.
1- MIMOSA COMPANY – Bekaa, Lebanon.
a- Power plant composed of three 550KVA Gensets with synchronizing
system.
b- Power plant composed of three 600KVA Gensets with synchronizing
system.
c- Power plant composed of six 550KVA Gensets with synchronizing system.
d- Power plant composed of three 3000KVA – 11 KV Gensets with
synchronizing system.
2- SOMOPLAST COMPANY – Bekaa, Lebanon.
Two power plants each is composed of three 550KVA Gensets with synchronizing
system.
3- SICOMO COMPANY – Bekaa, Lebanon.
Power plant composed of eight 600KVA Gensets with synchronizing system.
4- ALUTEX COMPANY – Bekaa, Lebanon.
Power plant composed of three 1000KVA Gensets with synchronizing system.
5- SANITA COMPANY – Beirut, Lebanon.
a- Power plant composed of two 550KVA Gensets with synchronizing
system.
b- Power plant composed of four 550KVA Gensets with synchronizing
system.
6- ICE SKATING – Beirut, Lebanon.
Power plant composed of three 550KVA Gensets with synchronizing system.
7- VERDUN 732- Beirut, Lebanon. – – –
MDB 1600A.
Totalizing 1600A.
ATS’s for 42 apartments and shops.
8- PALM SPRINGS VILLAGE – Beirut, Lebanon. – – –
MDB 1200A main.
ATS’s for 24 shops.
Motor control panel for 15 pumps.
9- LEBANESE UNIVERSITY – Beirut, Lebanon.
ATS and MDB 800A.
10- BHAMDOUN MEDICAL CENTER – Bhamdoun, Lebanon. – –
Load management for 3 Gensets 350 / 250 / 100KVA.
ATS’s for 14 apartments.
11- ROYAL PAPYRUS FACTORY – Beirut, Lebanon. – –
Load management for 3 Gensets 200KVA/ 150KVA/ 100KVA.
MDB 800A.
12- BEKAA WATER STATIONS – Bekaa, Lebanon. – –
Motor control panels.
Autotransformer for 27 stations varies from 35KW to 250KW.
13- SAHA RESTAURANT – Airport area, Beirut, Lebanon.
Load management for 2 Gensets 300/ 250KVA.
14- SHAIBOUB BUILDING – Beirut, Lebanon.
Load management for 2 Gensets 200/ 150KVA.
15- SHERATON CORAL BEACH HOTEL – Beirut, Lebanon. – – –
MDB1 4000A.
MDB2/3/4 1500A each.
Motor control center.
16- ISLAMIC ORPHANAGE – Beirut, Lebanon.
PLC’s and MCC control panels.
17- SHEIKH HOTEL – Beirut, Lebanon. – – –
MDB 1200A.
2 ATS’s 600A each.
Load management for 2 Gensets 500KVA each.
18- ALRASHID HOTEL – Bagdad-Iraq –
Built a power plant composed of three engines each is 2000KVA-11KV.
19- SEA WATER TREATMENT BARGES /
– Jeddah-Saudi Arabia
-Built two power plants on two Barges each is equal to 18MW.
20- -BEIRUT AIRPORT (SYNCH. PANEL 4X1500KVA GENSETS PERKINZ). / –
BUITL USING DEIF GAC CONTROLLERS. & ACB’S 3X2500A (ABB)
21- JIEH MARINA RESORT/
– 7 MDB’S 1000A EACH + ATS PANELS FOR -RESORT.)
22 -MINA ELHOSON. /
BUILDING IN THE CENTER OF BEIRUT -MDB + ATS500A.
23- HIJAZI GLASS FACTORY. /
FACTORY (SHWAIFAT 4 SYNCH PANELS 2X600KVA EACH)
24- GRAWI SWEAT FACTORY.
SYNCH PANEL 3 VOLVO 400KVA + ATS PANEL + MDB
25- SAHA RESTURANT /
TOUCH SCREEN FOR MONITORING AND CONTROL FOR ALL BOILERS
CHILLERS AND PUMPS.
26- CONVIVIUEM 6 BLDG/
BUILDING IN BEIRUT. SYNCH PANEL 2X500KVA GEN + ATS’S FOR
BUILDINGS A-B-C-B-E.
27- HAMOUD HOSPITAL
TOUCH SCREEN FOR MONITORING AND CONTOL FOR ALL FAULTS
(GENERATORS, FANS, PUMPS ELEVATORS, & REFIGIRATORS)
28 – FEEDER PILLARS FOR TUNELS
TRIPOLI WITH HOMAN COMPANY (15 PANEL)
29- MTC TOUCH
ATS- MDB (800A) & LOAD MANEGMENT PANEL JDIEDIEH CENTRAL.
ATS- MDB (800A) & LOAD MANEGMENT PANEL BEIR HASAN.
30- JIEH MARINA RESORT – MDB’S FORM 3B 4000A EACH + ATS PANELS FOR –JIEH MARINA
HOTEL.)
31- ZIENI FACTORY (YEAR 2013)
ZEINI STEEL FACTORY -SYNCHRONIZING PANEL 4X1000KVA CAT GENERATORS + MDB
32- MAZERAA 929
ATS PANEL 32 ATS 32 A – –
MDB PANEL 800A
MCC PANELS WITH PLC CONTROL (HMI).
33- AFRICA NIJIRIA PORTACORT UNIVERSITY POWER PLANEL 10M
34- LIBERYIA PORT
(ATS’S SYNCHRONIZING AND POWER PANEL FOR GENSETS 1500KVA.
35- -EAU ONE
(AT’S – MDB’S AND SISTREBUTION PANELS) –

36- SNAGRO SAIED FARMS.

 SYNCHRONIZING FOR 3 GENSETS (600KAV VOLVO+ 2X 400KVA PERKINS)

MDB +ATS +DISTREBUTION 1600A.

PLC CONTROLLER FOR SOLAR ON GRID 350 KW + PCS SYSTEM

TRAFFIC LIGHTS PROJECTS:
1- MUSHARFIEH INTERSECTION (BEIRUT- LEBANON)
2-AL- SHUHADA INTERSECTION (BEIRUT- LEBANON)
3- FRANCA BANK INTERSECTION (BEIRUT- LEBANON)
4-SEFIER INTERSECTION (BEIRUT- LEBANON)
5-FORON AL- WAFA’A INTERSECTION (BEIRUT- LEBANON)
6-ZAGHLOUL INTERSECTION (BEIRUT- LEBANON)
7-ELECTRICITY COMPANY INTERSECTION (BEIRUT- LEBANON)
8-PEDESTRIAN BRIDGE INTERSECTION (BEIRUT- LEBANON)
9-AL-SHUHADA COMPLEX INTERSECTION (BEIRUT- LEBANON)
10- HADI NASRALLAH HIGH WAY (BEIRUT – LEBANON) –

Solar Energy PROJECTS:
1- LIU BEIRUT CAMP BUILDINGS BLOCKS (A,B,C,D,E,F)
5 SYSTEMS FOR 80KW EACH (400KW) WITH (650PV 600W EACH)
2- SAMHOUN SAIDA ISHTIRAK (250KW SYSTEM ) ELECTRICITY SELLING
COMPANY.(420PV 670W EACH)
3- LIU SAIDA CAMP WITH CAR PARKING TENT ( 450KW SYSTEM WITH
600PV 600W EACH)
4- KOTOB BUILDING 30 PV 600W EACH.
5- SOLAR PUMP START UP 50KW PUMP FOR IRRIGATION SOUTH
LEBANON ANSAR.
6- KHALIFEH VILLA (120PV 550W EACH) UNDER CONSTRUCTION.
7- Jieh Marina project 700 PV 420KW .
8- LIU TRIPOLI (600PV 650W EACH) UNDER CONSTRUCTION.
9- SMALL APPARTMENTS AND VILLAS NOT MENTIONED.